一起數(shù)字化電能計(jì)量系統(tǒng)故障現(xiàn)場(chǎng)排查

來(lái)源:電工電氣發(fā)布時(shí)間:2018-02-13 09:13 瀏覽次數(shù):780
一起數(shù)字化電能計(jì)量系統(tǒng)故障現(xiàn)場(chǎng)排查
 
程含渺1,2,夏國(guó)芳1,2,梁凱3
(1 國(guó)網(wǎng)江蘇省電力有限公司電力科學(xué)研究院,江蘇 南京 210019;2 國(guó)家電網(wǎng)公司電能計(jì)量重點(diǎn)實(shí)驗(yàn)室,江蘇 南京 210019;
3 國(guó)網(wǎng)無(wú)錫供電公司,江蘇 無(wú)錫 214101)
 
    摘 要:介紹了一起數(shù)字化電能計(jì)量系統(tǒng)故障,依照現(xiàn)場(chǎng)排查步驟,逐步分析故障原因,發(fā)現(xiàn)故障是由光纖模式不匹配導(dǎo)致。檢查變電站其他光纖通信線路,發(fā)現(xiàn)同樣可能存在不同模式光纖混用的情況,提出了除長(zhǎng)距離傳輸場(chǎng)合,全站應(yīng)使用多模光纖,統(tǒng)一光纖接口,盡量減少或不使用接口轉(zhuǎn)換器等防范措施,為智能變電站運(yùn)維工作提供參考。
    關(guān)鍵詞:智能變電站;數(shù)字化電能計(jì)量;光纖;通信故障
    中圖分類號(hào):TM933.4     文獻(xiàn)標(biāo)識(shí)碼:B     文章編號(hào):1007-3175(2018)02-0042-03
 
Field Investigation About a Failure of Digital Metering System
 
CHENG Han-miao1,2, XIA Guo-fang1,2, LIANG Kai3
(1 State Grid Jiangsu Electric Power Co., Ltd, Electric Power Research Institute, Nanjing 210019, China;
2 State Grid Key Laboratory of Electrical Power Metering, Nanjing 210019, China;
3 State Grid Wuxi Electric Power Supply Company, Wuxi 214101, China)
 
    Abstract: Introduction was made to a failure of digital energy metering system. According to the filed investigation procedure, this paper analyzed the failure cause step by step and discovered that the mismatch optical fiber caused the failure. Other optical fiber communication lines in substation were checked, so as to find that there possibly existed different modes of fiber mixing. This paper proposed the precautionary measures that the multimode fiber should be used in the whole substation, the fiber interface should be unified and the interface converter should be used less even none, except for the long-distance transmission occasion, which provides references for the operation and maintenance of smart substation.
    Key words: smart substation; digital electrical power metering; optical fibre; communication failure
 
參考文獻(xiàn)
[1] 婁悅,秦華,孫純軍.220 kV西涇智能變電站二次系統(tǒng)的設(shè)計(jì)[J]. 華東電力,2011,39(5):732-736.
[2] 婁悅,秦華.220 kV西涇智能變電站二次系統(tǒng)設(shè)計(jì)技術(shù)研究[J]. 電力勘測(cè)設(shè)計(jì),2011(2):60-64.
[3] 程含渺,徐晴,紀(jì)峰,等. 一種用于電子式互感器相位補(bǔ)償?shù)臄?shù)字移相方法[J]. 電力工程技術(shù),2017,36(2):82-87.
[4] 吳琴芳,陳懇.IEC 61850與數(shù)字化變電站的應(yīng)用研究 [J]. 電氣技術(shù),2009(2):59-62.
[5] 徐焜耀,范昭勇,趙蔚娟,等. IEC 61850標(biāo)準(zhǔn)下采樣值傳輸?shù)膽?yīng)用[J]. 電力系統(tǒng)及其自動(dòng)化學(xué)報(bào),2009,21(6):107-111.
[6] Q/GDW 11111—2013數(shù)字化電能表校準(zhǔn)規(guī)范[S].
[7] 肖志剛,李斌成. 多模與單模光纖級(jí)聯(lián)系統(tǒng)對(duì)激光束的傳輸[J]. 中國(guó)激光,2008,35(6):855-860.